Senior Factory Production Planner
Great People make Schneider Electric a great company.
Do you dream of working in a company that is driven by a meaningful purpose and that continuously creates an inclusive environment where you are empowered to do your best and be innovative? Start making an IMPACT!
The Role: Senior Factory Production Planner
What will you do?
• Manages the process of production planning and cell loading.
Plans and coordinates the allocation of raw materials between facilities and other manufacturing sites (both internal & external) to optimize the production of division products based on the Master Production Schedule (MPS), raising the necessary heads-up on critical materials affecting the MPS build.
Analyzes supply status and availability of Finished Goods from Distribution Centers (DC) worldwide and realigns Finished Goods supply for healthy stocking
• Drives materials available to support MPS build the plan and works with the Procurement team to ensure timely deliveries of raw materials
• Analyzes MPS misses in Line Item (LIPAS) and Volume Performance (VOLPAS) against Schedule and relates the impact of misses on the Backorder Report / Release Unshippable (RU)
• Prepares a Recovery Plan for products or product family with critical Distribution Center (DC) and in-transit Finished Goods (FGs) supply and communicates exemption report to Management team, Demand and Supply Chain (SCP) Corporate Planning group
• Project possible backorders and request the necessary changes in MPS to recover from the backlog
• Review corporate sourcing reports for DC allocation and shipment prioritization
• Establishes priorities and sets logistics directions for specific customer orders in product shortage situations
• Works with New Product Development/Transfer (NPD/NPT) Planners and divisional management to ensure that prior to product transitioning, phased-out products have healthy supply positions and material supplies pipeline for those being phased in are in place
• Ensures Discrete Jobs are available in the Oracle system
• Works together with Production Planning & Control (PPC) Planner for the availability of locally supplied or Just in-time (JIT) materials
• Works with the Engineering support team on parts with Engineering Change Order (ECO) affecting the products
• Maintains tracker file for MPS LIPAS and production status information
• Works with the Operations team on manufacturing issues affecting the plan and escalates gap on any capacity constraints on resources - manpower, machines, methods
• Follows through timely preparation and release of ECO documentation for identified alternate parts
• Coordinates with Operations and Supply Chain team on inventory management and improves customer satisfaction
Who would be successful?
• With a Bachelor's Degree preferably in Engineering course, Accountancy or Mathematics
• With at least 2 years of Planning experience or related Supply Chain function acquired from an elec...
- Rate: Not Specified
- Location: Cavite, PH-CAV
- Type: Permanent
- Industry: Finance
- Recruiter: Schneider Electric
- Contact: Not Specified
- Email: to view click here
- Reference: 00958S-en-us
- Posted: 2024-11-01 07:20:59 -
- View all Jobs from Schneider Electric
More Jobs from Schneider Electric
- Sortierer für Pakete in Kappeln (m/w/d)
- Sortierer für Pakete in Silberstedt (m/w/d)
- Sortierer für Pakete in Glücksburg (Ostsee) (m/w/d)
- Operator Level I
- Position General Labor-Production I
- Shipping/Receiving Clerk
- General Labor II 2nd Shift
- Mechanic 1, Odessa, TX.
- Mechanic 2, Odessa, TX
- Floorhand 1, Williston, ND
- Floorhand 1, Snyder, TX
- Fishing Tool Supervisor 1, Levelland, TX
- Mini Bar Attendant
- Payroll Specialist
- Admissions Assistant
- RN
- Business Office Manager - Riverwalk
- FT Director of Nursing
- LVN
- Phyiscal Therapy Tech